Turano (Italy)
CONSTRUCTION OF THE PHOTOVOLTAIC SYSTEM, commissioned in September 2022.
N.2 photovoltaic systems for a total power of 12 kWp, connected to the grid, for self-production and self-consumption of energy from renewable sources with storage system and wallbox for recharging electric cars.
Palestrina – Rome (Italy)
CONSTRUCTION OF A PHOTOVOLTAIC SYSTEM with STORAGE BATTERIES AND ELECTRIC VEHICLE CHARGING, commissioned in March 2022.
20 kWp system connected to the grid, for self-production and self-consumption.
Made with Bonus 110 with LONGI modules, inverters and 45 kWh Sungrow batteries.